TX - Electrical Program: 2024 NFPA 70E, Admin Rules, and NEC Wiring Methods (PGM)
After successfully completing this course, you will be able to:
Part 1
· Recall key definitions used frequently in the trade
· List the required on-the-job training for a license issued by the department
· Describe the application process for an applicant and the required exam
· Recall the frequency and fees in which licensees must renew their license with the Texas Department of Regulations (TDLR)
· List the Electrical Contractors’ responsibilities
· List the responsibilities of all persons performing electrical work
· Recall the Standards of Conduct within any geographic location in the state when performing or offering to perform electrical work
Part 2
- Discuss the global changes that occurred in the 2024 edition.
- Define what an electrically safe work condition is and when it is required.
- Understand the process of establishing and verifying an electrically safe work condition.
- Explain why the boundaries of the electric shock approach were changed and how to address high-altitude installations.
- Describe the requirements for arc flash signage.
- Verify the PPE requirements for hand protection.
Part 3
· Explain the requirements for cables in attics as described in 320.23
· List the permitted uses of NM cable in 334.10
· Discuss the revisions in 334.24 for cable bending radius
· Describe why the allowances of 334.40 were expanded
· Recognize when 336.10 allows tray cable for services
· List the increased permitted sizes in 342.20 and 358.20 for IMC and EMT
· Explain the clarifications for Schedule 40 and Schedule 80 PVC in 352.10
· Recall when 352.44 requires expansion fittings
· List the permitted uses in 356.10 for liquid type flexible nonmetallic conduit
· Discuss the new allowances for EMT in 358.10
· Recall what the new Article 369 covers
· Explain what the new Article 371 applies to
Part 4
· Discuss the recognition of floating PV arrays in 690.4
· List the exceptions for rapid shutdown of PV arrays in 690.12
· Discuss the evolution of line-side connections of interconnected sources in 705.11
· Explain the new disconnect requirements for some energy storage systems in 706.15
· State why Article 722 was created
· Discuss the new Article 724
· Explain what a Class 4 system is in the new Article 726
· Recall the listing requirements for energy management systems in 750.6
· List the new requirements for load management in 750.30
· Discuss the new surge protection requirement for fire alarm systems in 760.33 and
· Explain why the title of Article 810 was changed