Oregon 2017 NEC Changes: A New Process and 5 New Articles and General Requirements
o Identify what article 425 fixed resistance and electrode process heating equipment covers and what it does not cover.
o differentiate between PV systems and large-scale PV electric power production facilities.
o locate installation requirements for energy storage systems,
o recognize different types of stand-alone systems, define a micro-grid, and
o locate installation requirements for direct current micro-grids.
o Explain the rules in the NEC Style Manual for definition placement in the 2017 NEC.
o Recognize the changes made to the definition of accessible readily, or what we know in the industry as readily accessible.
o Identify the new location of definitions associated with hazardous locations.
o Define new and revised terms used in the 2017 NEC.
o We'll also locate the requirements for reconditioned equipment.
o Apply the new torque requirements for connections. Locate the new working space requirements for limited access installations.
o Describe the requirements for labeling service equipment